
Inspecting the wires for the fan antenna prior to installation
|

One of the riggers begins installation of the cage antenna
|

The fan antenna has been partially installed on the yardarm
|

A good view of the twin stubs with the feedline connection completed
|

A painter gives one of the terminator boxes a fresh coat of paint
|

A closeup showing the insulators on the cage antenna
|
|

A great view of the ship showing the disc/cage antenna has been reinstalled.
|
|

Work begins on installing the terminator box for the twin whips on the
front of the bridge
|

Harry works on the terminator box in front of the bridge
|

It's hard to see, but the fan antenna has been completely installed
|